Vatika 44 is a 1.04 acre commercial complex at Sector 44, Gurgaon, close the Huda City Centre metro station. The project enjoys access from 18 m and 12 m wide three side peripheral roads. It offers approx. 1,08,000 sq ft of office space spread over 2 blocks of G+5 floors. Offices are judicially designed to allow plenty of natural light and views all round. The complex offers state-of-the-art facilities including VRV air-conditioning, 100% power back-up, high-speed elevators, multi-level security. Vatika 44 will have plush lobbies, and two-level basement parking. Beautifully landscaped central plaza is another noteworthy aspect of the project.




| Office Spaces | Office modules of three sizes |
| Offices designed having side cores areas judicially to ensure excellent quality of natural light and views all round | |
| Floor to Floor Height | 3.70 mts on typical floors |
| Approach and Access | Common drop offs for both the office blocks with entrance lobby at ground for the offices |
| Facilities and Amenities | Well designed lift lobby on all the floors |
| Passenger elevators designed to cater for the expected traffic | |
| Dedicated fire lift for vertical traffic movement incase on fire emergency | |
| Common toilet facilities provided on each floor |
| Lobbies and Common Spaces and Common Toilets | Finished in a combination of architecturally pleasing materials such as stone, high quality tiles, wall and ceiling finishes |
| Tenant Space | Adequate finishing margin shall be left on the floor for client fit-out works |
| External Façade and Finishes | A combination of architecturally designed external façade finishes in modern and contemporary materials such as cladding, high quality paint etc |
| Glazed aluminum windows along with curtain glass in locations according to elevation requirements | |
| Glazed aluminum windows along with curtain glass in locations according to elevation requirements | |
| Glazed aluminum windows along with curtain glass in locations according to elevation requirements | |
| Signage | All mandatory and directional signage project wide provided |
| PARKING | Multi-level basements |
| Provision for surface parking and a drop off area |
| Office Floors | Capital slab arrangement in office floors with clear height of 3.25 mts |
| RCC structure designed in strict compliance with all requirements of the Seismic Zone IV as prescribed in the Indian Standard Code |
| Normal Power Source | Power supply from the DHVBNL shall be made available |
| Power Back-up | 100% power back-up through DG sets designed and installed in compliance with stringent emission norms |
| Power Distribution | Power supply cables shall be drawn to the tenant’s distribution board |
| Metering | Dual energy meters installed for each tenant to measure consumption of normal power and back-up power supply separately |
| Earthling | Infrastructure and necessary installations will be provided |
| Lighting and illumination | Lighting and illumination of common areas as well as external areas designed scientifically to appropriate lux levels |
| Adequate provision for critical lighting in areas of circulation and emergency usage | |
| Architectural lighting to illuminate the complex to enhance its usability and footfalls |
| Office Blocks | Office space shall be air-conditioned through highly energy efficient VRV air conditioning System with BMS |
| Basements | Mechanical vntilation system in strict compliance with NBC norms |
| Fire Fighting and Suppression | Wet Risers, Fire Hose reels, Fire Extinguishers and Sprinklers – provided as per norms. Yard hydrants and firefighting pumps installed at lower basement levels as per the NBC norms along with dedicated fire tanks |
| Fire Escape | Provision for fire exits and escape stairs at appropriate locations in accordance with the NBC |
| Water Supply Systems | Designed to stringent standards and norms for public health and hygiene |
| Waste Water and Sewer Systems | As per public heath and sanitation standards and norms |
| Rain Water Harvesting | Rain water will be collected through network of pipes and installations and recharged into ground aquifers in compliance with the norms |
| CCTV Surveillance | Main entrance |
| Main lift lobby | |
| Basement lift lobbies / ramps | |
| Manned Security | Check posts at key locations within the complex. Boom Barriers at basement ramp entry and exits |